| Spesifikasi | Daya Utama | Daya Cadangan |
|---|---|---|
| Daya Terukur (kVA) | 650 | 715 |
| Peringkat Daya (kW) | 520 | 572 |
| Frekuensi (Hz) | 50 | |
| Model Mesin | 6KTAA25-G39 | |
| Kecepatan Mesin (RPM) | 1500 | |
| Fase | 3 | |
| PF | 0.8 | |
| Sistem Kontrol | Digital | |
| Tegangan Terukur (V) | 400/230 | |
| Kapasitas Tangki Bahan Bakar Waktu Operasi | ≥ 8 jam @ beban 75% | |
| Model & Produsen Mesin | 6KTAA25-G39 (SDEC) |
| Tipe Mesin | In-line, 4 langkah, berpendingin air; 4 katup, Turbocharged dengan aftercooler |
| Tipe Pembakaran | Injeksi langsung |
| Tipe Silinder | Liner silinder basah |
| Jumlah Silinder | 6 |
| Diameter x Langkah | 170 x 185 mm |
| Perpindahan | 25,2 liter |
| Rasio Kompresi | 16 : 1 |
| Urutan Pengapian | 1-5-3-6-2-4 |
| Sudut Maju Injeksi Bahan Bakar | Kontrol elektronik |
| Berat Kering | 2760 kg |
| Dimensi | 2348×1181×1659mm |
| Merek Alternator | BOBIG |
| Produsen Alternator | FUJIAN BOBIG ELECTRIC MACHINERY CO.,LTD |
| Model Alternator | BW-354F |
| Daya Terukur Alternator | 520kw/650kva |
| Tegangan Terukur | 230v/400v |
| Frekuensi Terukur | 50hz |
| Tipe Koneksi | 3 Fase dan 4 W |
| Jumlah Bantalan | 1 |
| Tingkat Perlindungan | IP23 |
| Ketinggian | ≤1000m |
| Tipe Exciter | Tanpa sikat, Penggerak mandiri, pengatur tegangan otomatis AVR, Tembaga 100% |
| Kelas Isolasi | Kelas H |
| Model | BSD715 (Tipe Terbuka) | BSD715S (Tipe Senyap) |
|---|---|---|
| Panjang (L) mm | 3900 | 5400 |
| Lebar (W) mm | 1610 | 2000 |
| Tinggi (H) mm | 2500 | 2500 |
| Kapasitas Tangki (L) | 1196 | 1196 |